School Construction

Summer 2018 Safety Vestibule Projects​ - Update

Please click here to view the construction update.

pic
pic 
pic pic
pic pic 
 pic  pic
 pic  pic

Summer 2018 Safety Vestibule Projects

Fall Projects 2016

Administration Building Restoration and Roof Replacement 2016 
(2-22-17 Update)
Update


Administration Building Restoration and Roof Replacement 2016 
(1-23-17 Update)
Update

Administration Building Restoration and Roof Replacement 2016
roof powerpoint


Summer Projects 2016

 

District Wide Parking and Paving Upgrades

Interior Painting at Main Road School, Mary F. Janvier School and the Administration Building

 

During the summer of 2016, the Township of Franklin Public Schools has embarked on a district wide paving project that includes the addition of parking spaces at the Main Road and Caroline L. Reutter Schools.  This project also includes the widen of the driveway entrance to the Administration Building/Mary F. Janvier side parking lot, along with the addition of bus parking located in front of the bus garage.  All of the district parking lots will be repaved to provide a smooth surface with a clean look. 

Interior projects include the repainting of all the hallways and the main office area at the Main Road School, repainting the all-purpose room and resurfacing the stage at the Mary F. Janvier School, repainting the cafeteria at the Caroline L. Reutter School and the repainting of several offices and the conference room at the Administration Building

Engineering Design Associates are overseeing all of the projects to completion.  South State Construction is the lead contractor for the paving project, while Personal Touch Painting Company is providing the painting services.  Below is a link to a PowerPoint update (as of July 20, 2016) that includes pictures of the project.

 Township of Franklin Public Schools.pptx

Township of Franklin Public Schools Update #2

These projects are a direct result of the continued support of Township of Franklin Community and the Board of Education….Thank You!

 



Summer Projects 2014

C.L. Reutter School Roofing/HVAC Projects Completed

 During the summer of 2014, The Township of Franklin Public Schools embarked on roofing and HVAC project at the C.L. Reutter School. This project called for demolition and reroofing of with extensive electrical and HVAC work. With the completion of the project, the C.L. Reutter School will have air condition in the kitchen, all-purpose room, and gymnasium.

Garrison Architects along with New Road Construction Management are overseeing the project to completion. Below is a link to a powerpoint update(as of August 20, 2014) that includes pictures of the project.

powerpoint

This project is a direct result of the continued support of Township of Franklin Community and the Board of Education….Thank You!

 



Summer Projects 2013

Mary F. Janvier and Main Road School Roofing/HVAC Projects Completed

 During the summer of 2013, The Township of Franklin Public Schools embarked on roofing and HVAC projects at both the Main Road and Janvier schools. Both projects called for demolition and reroofing of each school with extensive electrical and HVAC work. With the completion of the project, the Janvier School now has air condition in the kitchen, all-purpose room, and media center as well as new carpet in the media center. While the Main Road project brought central air conditioning to the kitchen, cafeteria and the gymnasium along with a new ceiling in the cafeteria (to be completed in June).

Garrison Architects along with New Road Construction Management oversaw both projects to completion. Attached are pictures of the final product.

Up One Level
 Albums
Main Road
Uploaded: 24 March, 2016
by: weihao.tian
Description:
Janvier
Uploaded: 24 March, 2016
by: weihao.tian
Description:
Main Road School
Uploaded: 24 March, 2016
by: weihao.tian
Description: Preschool Disabled Restroom Renovation (Classrooms 60 & 62) On May 28, 2013, the...
Mary F. Janvier School
Uploaded: 24 March, 2016
by: weihao.tian
Description: Lighting Upgrade – Classrooms (Kindergarten and first grade wings) Northeast...
Mary F. Janvier School (1)
Uploaded: 24 March, 2016
by: weihao.tian
Description: Upgraded Pump Station Control Panel A new upgraded pump station control panel with new...